Ingenix Robotics
SYSTEM INITIALIZATION... 100%
ROI Calculator

Calculate Your Profit

See exactly how much you save by switching from manual welding to an Ingenix robotic cell based on your local labor costs.

Input Parameters

$1,500

Includes taxes & overheads

3 ppl
USD

Payback Period

18 months

Break-even point

1st Year Profit

$-26,600

Net savings after equipment cost

5-Year Savings

$187,000

Long-term value accumulated

Cumulative Cost Comparison
(24 Months)

Manual
Robot
M0M3M6M9M12M15M18M21M24$0k$35k$70k$105k$140k

Need a detailed report?

Download the full breakdown or get a formal quote for your specific case.

Request Quote
Transparent Pricing

Investment range for
Ingenix robotic cells

Each Ingenix robotic welding cell is configured individually. The final investment depends on production requirements, automation level, and software configuration.

Typical Investment

$60,000 – 130,000

USD, excluding shipping & taxes

Key factors affecting the price

Beam type and dimensions (I / H / box / truss)
Welding volume and seam complexity
Number of robot axes and working zones
3D scanning and vision system
Level of automation

This approach ensures that customers pay only for what is required — without unnecessary hardware or locked software options.

Why pricing is not
“one-size-fits-all”

Unlike standard robotic cells, Ingenix systems operate directly from the 3D model and adapt automatically to different beam geometries and projects.

This flexibility significantly affects system configuration and investment level. As a result, pricing is always tied to real production tasks, not generic catalog options.

Project-Based Value

We analyze your drawings to guarantee the solution actually fits your workflow.

Typical Payback
12–24 mos

Most clients see full ROI in under 2 years

Labor Savings
60–80%

Reduction in manual welding hours

Customers achieve ROI through:

Reduction from 2–3 welders to 1 operator
Stable, repeatable welding quality
Elimination of manual reprogramming
Faster changeover between projects
Reduced dependency on skilled labor
Labor savings alone cover investment

Manual Welding vs Ingenix

See the difference in operational efficiency and stability.

Manual Welding Line

  • Multiple operatorsRequires 2-3 skilled welders per shift
  • Quality variationInconsistent results between welders
  • High dependencyReliance on skilled labor availability
  • Slow setupTime-consuming preparation for new projects

Ingenix Robotic Cell

  • One operatorOnly 1 operator needed per shift
  • Consistent qualityIndustrial-grade weld quality, 24/7
  • Automatic operation
    Directly from 3D model
    .IFC.STEP.IGS
  • No-code workflowMinimal setup, no programming skills needed

Is Ingenix the right solution for your factory?

Produce welded beams or structural steel
Already use 3D models (Tekla or similar)
Face labor shortages or quality issues
Ready to invest in long-term stability

Get a project-based estimate

If your production matches these conditions, our team can quickly evaluate feasibility and calculate a project-specific ROI.

Request Investment Estimate